
Freitag, 29. Mai 2009

The Jubilee
One of this sights is the London Brigde. London Bridge is a bridge between the City of London and Southwark in London, England, over the River Thames. It was the only bridge over the Thames downstream from Kingston until Putney Bridge opened in 1729.
The other sight is the Westminster Abbey. The Church of St Peter at Westminster, which is almost always referred to popularly and informally as Westminster Abbey, is a large, mainly Gothic church, in Westminster, London, just to the west of the Palace of Westminster. It is the traditional place of coronation and burial site for English, later British and later still (and currently) monarchs of the Commonwealt Realms. It briefly held the status of a cathedral from 1546–1556, and is currently a Royal Peculiar.
Circle line will be extended soon

London Underground has announced that Circle line services will be extended to Hammersmith from December 2009. The changes will almost double the frequency of trains between Hammersmith and Edgware Road. As Circle line trains currently move around the line without a fixed terminus, any delays are compounded over time, and make it harder to offer a regular or reliable service. By giving the Circle line a start and end point London Underground will be able to recover the service quicker if there is disruption on the Circle or any of the lines that it shares tracks with. The new service will run from Hammersmith (H & C station) to Edgware Road station and then join the current Circle at Edgware Road and make a single loop, terminating at Edgware Road station. It will then reverse and do the full circle anti-clockwise, returning to Hammersmith.
Added benefits:
The changes to service patterns on the Circle line will improve the reliability of the line, enabling services to recover more quickly if there is a disruption. The line will still be called the Circle line and shown as a circle on the Tube map. The added benefit will be the improved service on the Hammersmith & City line from Edgware Road round to Hammersmith, almost doubling the frequency on that route. This is the first phase of the Sub Surface lines upgrade, which will include a new fleet of air conditioned and accessible trains and a new state of the art signalling system.
Hammersmith& City Line
At the eastern end, a service opened beyond Liverpool Street to Whitechapel in October 1884 at the same time as the completion of the Circle.
Trains have run on from Whitechapel to Barking over District line tracks since 1936.
The Hammersmith & City line between Hammersmith and Whitechapel is 14.5 km in length and serves 19 stations.
The equivalent statistics for the extended service through to Barking - which runs until 21 00 Mondays to Fridays and until 20 30 on Saturdays - are 26.5 kmand serves 28 stations.
London Underground(circle line steiger)
Trains on the route were originally hauled by steam engines, but electrification was started with an experimental section in 1900. A disagreement between the two companies over the method of electrification delayed the exercise, so that the first electric trains were introduced gradually over the 11 days to 24 September 1905.
The introduction of this line took over many parts of the Metropolitan Line, confining it to the north-west and limiting its interchanges with the District Line. The Uxbridge branch of the Metropolitan last shared track with the District in 1933, when Piccadilly line services replaced the latter. In the east, the Barking service of the Metropolitan, also sharing track with the District, was designated part of the Hammersmith & City line in 1988, though in practice the Hammersmith & City was operated as a separate line many years prior to this date.
Following the attacks, the whole of the Circle line was closed. While most other lines re-opened on 8 July, the Circle remained closed for several weeks, reopening a little less than a month after the attacks, on 4 August. 14 people were killed by the blasts on the Circle line trains. A third attack occurred on the Piccadilly line between King's Cross St Pancras and Russell Square
London Underground (Central Line)

The Central line is a London Undergroundline, coloured red on tube map. It is a deep-level "tube" line, running east-west across London, and has the greatest total length of track of any line on the Underground. Out of the 49 stations served, 20 are below ground. It is the second busiest line on the Underground. The lenghts of this line is 74km.
Although the Central London Railway was incorporated in 1891 for a line between Sheperd's Bush and Bank, the time for completion had to be extended twice (1894, 1899); and it was not until June 27, 1900 that it was formally opened, a month before public traffic began to use the railway on July 30, to Bank station. The railway was initially operated by electric locomotives hauling a train of trailer cars. The distinctive station buildings, many of which survive, were designed by the architect Harry Bell Measures.
Bakerloo Line

The Bakerloo Line is a line of the London Underground System,it is colored brown on the Tube map. It runs partly on the surface and partly at deep level, from Elephant and Castle to Wealdstone.
Deep Level:
These sections are typically much deeper than the sub-surface sections. The deepest point on the whole tube network is 220 feet deep.
History
Originally called the Baker Street & Waterloo Railway, the line was constructed by the Underground Electric Railways Company of London Limited and opened between Baker Street and Lambeth North (then called Kennington Road) on March 10, 1906. It was extended to Elephant & Castle five months later, on August 5. The contraction of the name to "Bakerloo" rapidly caught on, and the official name was changed to match in July 1906.
The Bakerloo Line serves 25 stations and is 23.2km long. It makes 104,000,000 journeys per annum.


